Add, change and delete actual costing per week (PtRealizationWeek UpdateConnector)
UpdateConnector for adding, changing or deleting actual costing lines per week
UpdateConnector name: PtRealizationWeek
Note:
You can retrieve a list of fields to be supplied for each UpdateConnector and generate an XML example. See the description for AFAS Online or for a local installation.
Contents |
Preparation
- Actual costing (general comment)
Description
Actions that can be performed with the connector |
|
INSERT |
Add records Employee and date are mandatory. |
UPDATE |
Change records Employee, date and record number ('Id') are mandatory. |
DELETE |
Delete records Employee, date and record number ('Id') are mandatory. |
Points of attention:
- Profit uses the date to find the week number in the period table.
Directly to |