Add production orders (FbAssemblyPrep UpdateConnector)
UpdateConnector to add assembly preparations.
UpdateConnector name: FbAssemblyPrep
Note:
You can retrieve a list of fields to be supplied for each UpdateConnector and generate an XML example. See the description for AFAS Online or for a local installation.
Contents |
Preparation
- Assembly preparation (general comment)
Description
Actions that can be performed with the connector |
|
INSERT |
Add records Download an XML example file (simple example) Download an XML example file (detailed example) |
Not possible with the connector:
- Add assemblies.
- Convert assembly preparation to an assembly.
- Change assembly preparations
- Delete assembly preparations
Directly to |