Add hour types (leave to actual costing)

You add the hour types Profit should use to enter the actual costing of the leave. These must be hour types of the Leave type. You can use multiple hour types of the Leave type, for example, one for holidays and one for WTR.

To add hour types:

  1. Go to:
    • Projects / Project / Hour type.
    • HR / Payroll / Configuration / Hour type, if you do not have Profit Projecten.
  2. Click on: New
  3. Enter the code in Hour type.
  4. Enter the description.
  5. Select Leave for Hour type.
  6. Select the Blocked for manual entry check box.

    This way you prevent manual entries from being posted to the hour type in Profit Projecten.

  7. Click on: Next
  8. Do not select the Provides leave entitlement check box. This setting is important for determining the leave entitlement based on the actual costing.
  9. Click on: Finish
  10. Click on the action: Integration Payroll, if you want to channel the leave data to Profit Payroll.
    1. Per CLA select a wage component in hours and a parameter.

      You only see the activated wage components with the entry level Allow entries via entry program.

    2. Click on: Finish.

Directly to

  1. Leave to project actual costing
  2. Add hour types
  3. Configure leave types
  4. View the actual costing of leave
  5. Actual costing lines for leave to Payroll